C-1 Scrapping to remove barnacles and other sea growth from keel to DLL.
C-2 Hose down with fresh water from keel to DLL. C-3 Power brushing of hull from keel to DLL. C-4 Sandblasting of hull to SA 1.0. Shell Surface Area Computation to include rudder, skeg, side keel and other appendages. C-5 Sandblasting of hull to SA 2.0 C-6 Sandblasting of hull to SA 2.5 C-7 Application of paint to the hull. C-7.a Touch-up coat primer. C-7.b Full coat primer/anti-corrosive. C-7.c Full coat anti-fouling. C-7.d Full coat bootopping. C-7.e Full coat topside. C-7.f Full coat superstructure siding. C-8 Apply paint to vessel plimsol & draft marks. C-9 Remove wasted zinc anodes and straps. C-10 Install new zinc anode strap type. C-11 Install guard to strap type zinc anodes. C-12 Install base full welding type zinc anodes. C-13 Fabrication/installation of zinc anode baseplate. C-14 Apply grease on zinc anode. C-15 Install temporary scupper plugs in way of hull painting. C-16 Fabrication and installation of numerical draft. C-17 Fabrication and installation of vessel name and loadline markings. C-18 Install zinc anode at ballast tanks of anodes. C-19 Blasting to S.A. 2.5 of new plate including application of one (1) coat primer.
|
|
|
|
|
|
|
|
|