A-1 Docking and undocking
A-2 Laydays A-3 Mooring and unmooring A-4 Tug assistance A-5 Provide shore line handling for docking A-6 Provide temporary ladder to the Vessel to facilitate works B-1 Scaffoldings B-2 Breaking of blocks B-3 Shifting of blocks B-4 Erection of side blocks B-5 Conduct survey to determine the general condition of the hull. B-6 Conduct pre-docking survey in preparation of the docking plan and post docking survey in preparation of the shell expansion plan. B-7 Installation of stagings B-8 Installation of temporary shorings in way of reblocking works. B-9 Provide new sets of block to replace after breaking.
|