D-1 Pull-out anchor and chain from locker and lay-out in yard re-stow after works.
D-2 De-rust chain. D-3 Calibrate anchor and chain & issue certificate. D-4 Renew chain stud. D-5 Reweld loose stud. D-6 Bail out mud from chain locker. D-7 Wash down with fresh water chain locker. D-8 Apply paint/coating to chain locker. D-9 Remove grating & flooring plate of chain locker. D-10 Pumping-out of water from the chain locker D-11 Disconnect/reconnect bitter ends. D-12 Invert ends of chain. D-13 Exchange Port & Starboard chains/anchor. D-14 Renew anchor/chain swivel. D-15 Apply one (1) coating to chain and anchor. D-16 Range-out aft anchor and chains and lay-out at yard re-stow after works. D-17 Free-up frozen swivel. D-18 Free-up tangled chains. D-19 Pull-out and reinstall anchor windlass gypsy head. D-20 Pull-out and reinstall anchor windlass wild cat. D-21 Pull-out and reinstall anchor windlass brake drum. D-22 Pull-out and reinstall anchor windlass brake band after renewal of lining. D-23 Re-align anchor windlass base after steel works including fabrication of shims and base bolts. D-24 Crop-out and fabrication of anchor windlass base. D-25 Build-up worn-out section of anchor eye. D-26 Renewal of anchor shackle. D-27 Build-up anchor pin and housing. D-28 Fair-up and align anchor arm. D-29 Build-up anchor chain guide. D-30 Build-up anchor wild cat. D-31 Repair of chain hawse pipe. D-32 Reverse anchor shackle. D-33 Renewal of flange to main deck attached to Anchor Chain Pipe. D-34 Pull-out and re-install Anchor Chain Bitter ends in way of Chain Locker repair. D-35 Reweld crack portion of hawse pipe. D-36 Build-up Winch gear. D-37 Build-up anchor chain guide. D-38 Renewal of anchor chain eye holder of chain locker. D-39 Pull-out and re-install Winch gear (Primary) and bring to shop for works. D-40 Pull-out and install new anchor pin. D-41 Renew anchor hawse pipe. D-42 Renew anchor chain pipe. D-43 Remove and re-installation of bell mouth inway of replating.
|